This is the first pour. In a few days (fingers crossed, again) more forms will be built for the stem wall. That will be about 26" tall. I won't go into aggregates, admixtures and slump here but, let me just say that our next pour will have a slump of no more than 5 to 6 (preferably 4 to 5 but, that might be to difficult to move around) and will have some retardant to slow drying time.
I know concrete drying isn't very exciting for most people but, it is thrilling for us.
Rickey trying to figure out why the vibrator quit working. And, no I have not been playing with it!